ITD Projects South-Central Idaho Idaho 75 - Blaine County Projects

Idaho 75 - Blaine County Projects



Project Descriptions

The page is to describe ITD-administered construction projects taking place on Idaho 75 and U.S. 20 within Blaine County. Regular updates of construction activities for each project will be provided for general use only – dates and activities may change throughout construction.

ID-75: Jct. US-20 to Milepost 105.6

Project Key No.: 12068
Work will consist of a thin-lift asphalt plantmix overlay from milepost 102.1 to 105.6 followed by a chip-seal coat from milepost 102.2 to 107 and will include the Timmerman Rest Area parking lot.

ID-75: Hailey to Ketchum

Project Key No.: 12408
The project consists of preventative maintenance techniques from the north end of Hailey through Ketchum (milepost 117-129).  The project will repair sections of road on a temporary basis until reconstruction can be achieved.  The project involves a combination of site-specific roadway milling and inlay paving, asphalt plantmix overlay, and a microseal.  Microseal to be completed in summer, 2012.

ID-75: Frenchman Creek to Stanley

Project Key No.: 12214
Work will consist of a thin-lift asphalt plantmix overlay followed by a chip-seal coat from near the Frenchman Creek turnout through upper Stanley (milepost 162.9 to 190.0). Project will include new guardrail and roadside delineators. Chip-seal to be completed in summer, 2012.

US-20: Poison Creek to Milepost 181.1

Project Key No.: 11601 & 12077
Work will consist of a thin-lift asphalt plantmix overlay followed by a chip-seal coat from milepost 171.1 to 181.1. Project includes bridge maintenance to the Big Wood River Bridge at milepost 176 (Stanton Crossing).

Contacts

District 4 Public Information – Nathan Jerke
nathan.jerke@itd.idaho.gov
208-886-7809

Project Manager – Bruce Christensen
bruce.christensen@itd.idaho.gov
208-886-7860




Compliance with Title VI of the Civil Rights Act
The Idaho Transportation Department (ITD) is committed to compliance with Title VI of the Civil Rights Act of 1964 and all related regulations and directives. ITD assures that no person shall on the grounds of race, color, national origin, gender, age, or disability be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any ITD service, program, or activity. The department also assures that every effort will be made to prevent discrimination through the impacts of its programs, policies, and activities on minority and low-income populations. In addition, the department will take reasonable steps to provide meaningful access to services for persons with Limited English Proficiency.

Weekly Construction Update

News Releases and Handouts


 
ITD Public Involvement
comments@itd.idaho.gov
P.O. Box 7129
Boise, ID 83707-1129
Phone: (208) 334-8119
Fax: (208) 334-8563
TDD: (208) 334-4458

Page Last Modified: 1/31/2012 8:46:27 AM

About Us | Traveler Services | DMV | Projects | News And Info| Privacy & Security
Idaho Transportation Department
3311 W. State Street P.O. Box 7129
Boise, ID 83707-1129
(208) 334-8000